Indicative Engineering Assessment
Earlier Structural Insight. Faster Tower Upgrades.
With NexDT, tower owners and their MNO customers can assess proposed structural design changes directly in the digital twin, helping confirm that the final proposed configuration does not exceed tower capacity before formal engineering sign-off.
IEA helps teams test colocation, upgrade and equipment scenarios in the sandbox, understand likely structural impact in real time, and move better-vetted designs into formal engineering review.
Request Demo Watch IEA in Action
Extended Demo
See Indicative Engineering Assessment (IEA) in action
The problem
The structural bottleneck sits too late in the workflow
Every equipment change on a tower creates a structural decision. Adding a tenant, upgrading to 5G, changing antenna positions or modifying mounts all require validation, but in many workflows formal engineering is still the first real checkpoint.
That slows everything down.
If a proposal is not viable, teams often discover it only after design effort, customer engagement or equipment planning is already well advanced. The result is redesign, repeat review and delay.
Why this becomes a bottleneck
- Every change depends on formal engineering review
- Structural issues are often discovered too late
- Slow iteration leads to unnecessary redesign
- Conservative decisions can drive avoidable reinforcement and CapEx
IEA — Live Scenario Tester
Current State
- 2 Panels
- Full 5G Kit
Optimised Config
Tower #T-4821 — Structural Output
| Existing | Existing + Proposed | |
|---|---|---|
| Structure(%) | 71% | |
| Footing(%) | 65% | |
| Rotation(deg) | 0.70° | |
| ✓ Within capacity — proceed to formal review |
AS/NZS 4600 · TIA-222-H · AISC 360 · Rotation limit: 1°
Without IEA
- Sequential, manual review process
- 8+ Weeks
Propose Change
Team designs upgradeSubmit for Review
Wait weeks for engineeringIssue Discovered
Design doesn't meet capacityRedesign & Repeat
Back to step 1
With IEA
- 2–3 Days
- Time saved
- 90%+ Faster
- Weeks → Days
The solution
Indicative structural assessment in the digital twin
The IEA Tool gives operators a faster way to understand how proposed equipment changes may affect tower or monopole utilisation before formal sign-off begins.
Working inside the NexDT sandbox, teams can test structural design scenarios, compare options and get immediate indicative feedback on likely utilisation change. That helps rule out weaker designs earlier and move stronger configurations into certified review with more confidence.
Fewer weak designs
- Entering review
Faster iteration
- Test scenarios in sandbox
Fewer surprises
- Late-stage issues caught early
Quicker workflows
- Colocation and upgrades accelerated
Streamline tower upgrades with NexDT
Test structural scenarios earlier, reduce rework before formal review, and move better-vetted designs into engineering sign-off.